ChallengesObjectives
Project kick-off to start up was 15 months. A 3D laser scan of the site was captured and implemented into the design model. The brownfield project required integrating new equipment with existing infrastructure. Our team of specialists provided all discipline engineering services and leveraged off our sub-contractor partnerships to deliver the project on budget ($27MM).
Project included:
- 2800HP compressor
- 10,000bbl/d condensate stabilization
- 400HP overheads compressor
- E-House
- Inlet separator
- Dehydration
- Custody transfer metering
- Tank Farm w/ Pump Building
- Flare stack
Your Project, our Expertise
Bring us your technical challenges.
Our teams support you at every step for tailor-made and optimized solutions.